Posts

Showing posts with the label Surveying

objective of Survey

The object of surveying:- It is the preparation of a plan and map Plan:- Large scale representation of small areas is called a plan. Map:- Small scale representation of small areas is called a map. Principal of surveying:-                1. To work from whole to the part                2. To locate a new station at least two measurement If the curvature of the earth is considered then it is called Geodetic surveying (Area > 250 km2) If the curvature of the earth is not considered then it is called Plane surveying (Area < 250 km2) The difference between the length arch of the circle and subtended chord on the surface of the earth is 0.1m for 18.2km, 0.3m for 54.3km, 0.5m for 91 km Sum of the angles on the spherical triangle on the earth surface & corresponding plane triangle is 1 sec per 195.5 Sq. km area.  The plane angle measured in terms of radians Spherical triangle is measured in...

Basic tips of Surveying

Surveying 👉 Object of surveying :- It is the preparation of plan and map 👉  Plan :- Large scale representation of small areas is called plan. 👉 Map :- Small scale representation of small areas is called map. 👉 Principal of surveying :- 1. To work from whole to the part 2. To locate a new station at least two measurement 👉 If the curvature of earth is considered then it is called Geodetic surveying (Area > 250 km2) 👉 If the curvature of earth is not considered then it is called Plane surveying (Area < 250 km2) 👉 The difference between the length arch of circle and subtended chord on the surface of earth is 0.1m for 18.2km, 0.3m for 54.3km, 0.5m for 91 km 👉 Sum of the angles on spherical triangle on the earth surface & corresponding plane triangle is 1 sec per 195.5 Sq. km area. 👉 Plane angle measured in terms of radians 👉 Spherical triangle is measured in terms of steradians.                        ...